Piping Hydrostatic test for south pars offshore packages

Piping Hydrostatic test for south pars offshore packages

After completion of piping fit-up, hydrostatic test was performed for Sanitary water treatment packages(South Pars Gas Field Development-Phase 14) according to test procedure and in the presence of third party inspector. The results were satisfactory and no objection remained.

South Pars Gas field Development - sanitary water package

South Pars Gas field Development - sanitary water package

Package description:

This project has been defined as one of the required packages for the Pars Oil & Gas Company by means of ISOICO [Iranian Shipbuilding and Offshore industries Complex: for the 14th phase of South Pars Gas Field Development Offshore Platforms. The purpose of waste water treatment package is reducing or removing the contaminants of wastewater through physical chemical and biological treatment until sludge became suitable for discharge or to be recycled back into the environment. The current sanitary water treatment package is designed for treatment of 1.2 cubic meters per day in normal conditions and 2 cubic meters per day as maximum flow capacity. Typically, sewage treatment involves three stages, called primary, secondary and tertiary treatment. First the solids are separated from the wastewater stream. Then dissolved biological matter is progressively converted into a solid mass by using indigenous, water-borne bacteria. Finally the biological solids are neutralized then disposed o f or recycled.

 

 

 

 

 

 Navigation